With grid interconnection approvals potentially taking a decade, US data center developers are increasingly building their own off-grid gas power plants. As of October 2026, more than 100 behind-the-meter gas projects have been announced, totaling over 115 gigawatts of planned capacity, more than double California's peak demand, with most announced since early 2025. xAI's Memphis campus pioneered the approach but faces legal battles over unpermitted turbines, and the strategy raises concerns about cost shifting and environmental impact.
Termsslug: behind-the-meter-generation
Behind-the-Meter Generation
表后发电
On-site generation placed behind the utility meter, supplying data centers directly and bypassing the public grid.
Curated Intelligence
MIT Technology ReviewT2·Infra
78 pts
Rohan Paul (@rohanpaul_ai)T2·Infra
72 pts
Microsoft is pairing its $117B annual capacity build with a pledge that taxpayers and other utility customers will not absorb the added power costs. Its answer is behind-the-meter generation: a 2.67GW Chevron gas plant selling electricity directly to a Microsoft data center under a 20-year deal. The model still needs political approval, with Texas Governor Greg Abbott's data-center permit moratorium and a potentially tougher successor posing key risks.